Resolved Process issues quickly to maintain production/Environmental goals.
Coaching CCR/ Production operation on the process troubleshooting aspects and clarity on deliverables.
Minimized resource and time losses by addressing employee or production issue directly and implementing timely solutions.
Successful participate preparation of the GSD 2019, and execution as Work Permit Coordinator
Successful preparation and execution of the GSD2020
Preparation of the FFSD 2020
Senior Production Support Engineer
Total E&P Angola
LAD TTA1
04.2018 - 02.2019
Maintained excellent collaboration with SMART Room/DALIA FPSO, for Tier 2 actions
Performance actions proposed and conducted aiming the goal of gain more barrels for DALIA (1st stage pressure reduction field test)
Assistance to HQ/Process for DALIA Phase#4 / CIMS project
Online desanding for Dalia/Girasol - Preparation phase
Assistance to HQ/PW specialists troubleshooting onboard.
Head of Production Services 17A
Total E&P Angola
LAD TTA1
12.2016 - 04.2018
Responsible for support of production for DALIA & GIRASSOL FPSO
Worked to maintain production targets, on context which the change of demulsifier on Girassol impacted the Operation discharge and Oil loading.
Close-out of the Online desanding commercial issue for Girassol
Assistance to Site/Smart room on the first well Clean-up direct to the process.
Process assistance to Site/Maintenance on the issues with LP/MP Gas compression on GIRASSOL.
Recommendation for CI injection on DAL/GIR, as well as, proposal to design modification to ensure the proper injection.
Identified potential issue on the Operation discharge caisson
Coaching and sharing process project experience with all members in my team.
Lead Process Engineer
TGI SA
Singapure, Simbawang Yard
11.2015 - 12.2016
Reviewed processes, identifying potential change on the design at the construction phase.
Designed PWBD for late integration during the field life
HIPPS champion of the last HIPS Committee the project
Close-out of all Process philosophies and latest revision of the P&ID, on a ASB revision.
Definition of the PW Override philosophy
Provided technical assistance to engineering manager/Process & Utilities area Leaders when issues arose.
Created Process REX and lessons learned for all the phases of the project
Lead Process Engineer
TGI SA
Paris / SAIPEM Offices
09.2015 - 11.2015
Close-out of all Process calculation notes and simulations.
Reviewed FMC / Frames design and suggested key improvement to on the potential issues on the vessels internals design.
Generated detailed reports covering analysis of key data and outlining potential solutions.
Close-out of the process HAZOP Cards
Deputy Lead Process Engineer
TGI SA
Paris / SAIPEM Offices
04.2014 - 09.2015
Early Engineering/ Detail Engineering on the CTR offices
Reviewed all the Process/ other disciplines documentation aiming the alignment with the minimum requirements, and ensuring documents are mature enough to before start the construction phase.
Participation on the FPSO HAZOP as CPY process representative
Worked to close SPOT / PTR actions raised to Process discipline
Helped CTR redesign chemicals skid in order to be as close as possible of the other Angolan FPSOs
Helped CTR to provide an acceptable drainage philosophy, obeying Angola Decree 97/14.
Junior Process Engineer
TGI SA
Paris / Newton
03.2012 - 04.2014
Participation on the FPSO HAZID
Participation on all FEED phase with three Tenders (MODEC, SBM & SAIPEM)
In charge to review the RAM of the three Tenders (assisted by Process Lead)
Participation on the PINK Room, as part of the Process reviewers
Reviewed all the P&ID and Process philosophies, and when required mission to face-to-face discussion with Tenders were organized
Developed documentation, including diagrams to the HIPPS Committee (considering the three Tenders)
OLGA / HYSYS simulations to compare the three Tenders
Production Support Engineer
Total E&P Angola
LAD TTA1
10.2010 - 04.2012
Performed root cause analysis for Shutdown & other production losses provide report Head of Production Support.
Conducted mission with TRACERCO to detect impact of the inlet devices on the separators DS3100A/B.
Conducted mission with TRACERCO to detect pollution on the heating medium.
Developed tools in line with Total GM, to easily Safety valves testing
Proposed preliminary study to ADP to inject water from GIR to DAL, using Subsea
Developed several PI tools to monitor GIR/DAL FPSOs
Conducted field test to inject viscosified water on Dalia reservoir.
Logistics and Procurement Manager at | Lassarat Angola | Total Energies, Block 17Logistics and Procurement Manager at | Lassarat Angola | Total Energies, Block 17