Overview
Work History
Timeline
Generic

Simão Lubendo

Cabinda/ Centralidade Pitra-Petroff

Overview

1
1
year of professional experience

Work History

Coating Inspector

SELLHORN INGENIEURGESELLSCHAFT
04.2023 - Current
  • Trained others on operation and setup of powder coat operations.
  • Communicated and escalated with peers and principles.
  • Measured and improved processes to meet organization goals.
  • Performed powder, troubleshooting and maintenance activities.
  • Maintained detailed records of inspection results, reporting any issues to relevant stakeholders for prompt resolution.
  • Set up and operated powder coating and assorted power and hand tools.
  • Conducted comprehensive equipment checks to confirm proper functionality, ensuring accurate readings during inspections.
  • Ensured compliance with industry standards by meticulously reviewing project specifications and adhering to guidelines.
  • Increased coating longevity by advising on best practices for surface preparation and application techniques.
  • Mentored junior inspectors in best practices for inspection procedures, contributing to a knowledgeable workforce capable of maintaining high-quality standards consistently.
  • Contributed to a safe work environment by adhering to safety protocols and implementing best practices in hazard recognition and risk reduction.
  • Facilitated communication between engineers, contractors, and clients to ensure consistent understanding of project requirements and expectations.
  • Improved coating quality by conducting thorough inspections and identifying areas for improvement.
  • Collaborated with cross-functional teams to assess potential risks in the coating process and develop mitigation strategies accordingly.
  • Examined products for imperfections and defects.
  • Followed standard operating procedures for inspections and tests.
  • Recorded inspection and test results on data sheets.
  • Monitored product quality at all stages of production process.
  • Updated quality control records and reports.
  • Trained other workers in inspection and testing procedures.
  • Checked color, shape, texture and grade of products and materials against established templates, charts, and samples.
  • Followed safety protocols while handling hazardous materials.
  • Provided feedback to production team regarding product quality.
  • Sampled products to verify compliance with standards
  • Assisted in developing inspection and testing protocols.
  • Developed customized inspection plans based on specific project requirements, ensuring comprehensive assessment of all relevant aspects of the job site environment.
  • Demonstrated commitment to professional development by maintaining industry certifications and pursuing additional training opportunities as needed.
  • Evaluated new products and technologies within the coatings industry to stay current with market trends while making informed recommendations for future projects.
  • Streamlined reporting processes by developing efficient documentation templates that standardized data collection across multiple projects.
  • Repaired faults, reassembled products, and completed additional tests.
  • Utilized quality control software to track and analyze product data.
  • Recommended architectural improvements, design solutions, and integration solutions.

Timeline

Coating Inspector

SELLHORN INGENIEURGESELLSCHAFT
04.2023 - Current
Simão Lubendo